Smart Parking

Compare mechanical parking and combined parking and charging around the site's footprint, clear height, and vehicle turnover.

Explore the catalogue

Equipment and configurations

Vertical lift parking

A lift transfers vehicles to bays on different levels. A tower layout is worth evaluating where the footprint is limited and vertical space is available.

Lateral transfer and automated handling

Transfer equipment moves vehicles horizontally on a parking level. Compare layouts against handover bays, entrances, and peak retrieval demand.

Combined parking and charging

A separate charging zone can work with a mechanical parking system. Handover, charging, storage, and scheduled retrieval can then be planned as one sequence.

Brochure example

The brochure illustrates a vehicle left in a handover bay. An automated guided vehicle (AGV) moves it to a dedicated charging area and then transfers it into the mechanical garage.

Images and examples are from Zhongkuang Bailian’s new energy materials.

What to share about your project

  • A site plan, available clear height, and vehicle entrances and exits.
  • Target bay count, typical vehicle dimensions, and peak arrival and retrieval times.
  • The share of bays or vehicles that need charging and any scheduled retrieval requirements.

Tell us about your project

Share how the site will be used, the expected scale, and your timeline so we can discuss suitable options.

Discuss a new energy project

Products, specifications and projects

Sources include Zhongkuang Bailian’s new energy catalogue and presentation. Targets, tests, certifications, operating figures and cases follow those materials. Consult the project documents for conditions and scope.

On this page

Source page 8

Smart parking equipment

The catalogue lists six parking configurations from vertical lift and horizontal transfer to AGVs, and reports more than 90 smart parking projects.

The six equipment configurations are vertical lift garages, horizontal transfer garages, vertical lift bus garages, underground shaft garages, vertical lift towers and AGV mechanical garages.

Source page 22

Multi-storey parking solutions

Tower, warehouse, spanning, underground shaft and AGV options are shown. The source notes a tower example at 1 m² per car, retrieval as fast as 60 seconds and app booking.

The catalogue places warehouse garages in high-footfall locations such as malls and hospitals. Spanning garages can use fragmented urban spaces. Underground shaft garages use below-ground space, and AGV systems adapt to different garage layouts.

Source page 23

Multi-storey parking projects

Six examples cover Shenzhen, Guangzhou, Shijiazhuang and Shanwei, including a bus depot, park, zoo, underground facility, urban garage and university.

Chinese source text

深圳市南山中心区智慧公交车库项目;深圳市四海公园立体停车库项目;广州市动物园南门立体车库项目;石家庄元南公园绿地地下停车场项目;汕尾市城区立体停车楼项目;广东工业大学立体车库项目。

Source page 24

Citywide parking and charging integration

A citywide platform connects on- and off-street parking, mechanical garages and public, destination and fast charging. It unifies search, booking, navigation and payment, and uses load forecasts and storage for energy dispatch.

A common platform links roadside, commercial and community parking. Fast, public and destination charging form a citywide network. Operators manage information and payments centrally, while drivers search, book, navigate and gain access with a common code.

Load forecasting and dispatch work with storage to shift demand from peak to off-peak periods.

Source page 25

AGV parking and charging workflow

An AGV receives the vehicle at a handover bay, moves it to a charging bay and then stores it in the mechanical garage. Status and pickup can be checked or scheduled remotely.

The equipment layout includes buffer bays, the garage transfer hall, a handover area, AGVs, charging bays, automated charging robots, liquid-cooled fast chargers and mechanical parking spaces.

Source page 26

Integrated parking and charging projects

The source shows Yangchun’s public parking and charging upgrade, the Yuancheng (Heyuan) smart parking project and Shanwei’s phase-one parking structure and charger project, using project cooperation and EPC+O models.

Chinese source text

通过项目合作与 EPC+O,统筹公共泊位和充电基础设施建设、运营。案例包括阳春市公共停车位智慧化改造及充电基础设施建设一期、河源市源城区智慧停车建设勘察设计施工总承包及运营、汕尾市城区提能升级一期立体停车楼及充电桩。